My Home Page
How to Contact Me
Download or View My Resume
View My GIS Labs & Projects
View my GIS Certificate

GIS Articles

What is GIS?
Get Rich w/GIS

Web Creations

Nethancock
Dial Evolution
Oral Health Center
A Student's Report

 


GIS Labs, Projects & Presentations  /  ESRI Wastewater Junction Project

   
 
View this Map
[ 1200 x 800 | 3200 x 1200 Full Size ]

[ PDF Version 1.6 mb ]

ESRI Wastewater Junction Project
This was a sample GIS project detailed throughout ESRI's ArcGIS 9.0 "Getting Started" manual.
The objective of this project was to find suitable locations for a new wastewater treatment plant.

The city provided a list of criteria for a suitable location. The wastewater treatment site must meet the following requirements:

" Located within 1000 meters of the river
" Elevation 365 meters or less
" Outside the flood zone
" More than 150 meters from residences and parks
" Currently vacant parcels

Additional Site Criteria:

" Located within 50 meters of an existing road
" Within 1000 meters of the existing wastewater junction, however, within 500 meters is preferable.

Reference:
ESRI. (2004). Getting Started with ArcGIS. ESRIPress, Redlands, CA.

   
Page Under Development - More details coming

Steps in Planning a GIS project
1. Identify project objectives
2. Collect and co-register the data
3. Perform GIS Analysis
4. Present results
 


Copyright 2005, GISAnalyst.com & RandyHancock.com